Skip to main navigation Skip to search Skip to main content

Delay analysis of a point-to-multipoint spectrum sharing network with CSI based power allocation

  • Fahd Ahmed Khan*
  • , Kamel Tourki
  • , Mohamed Slim Alouini
  • , Khalid A. Qaraqe
  • *Corresponding author for this work
  • King Abdullah University of Science and Technology
  • Texas A&M University at Qatar

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

Abstract

In this paper, we analyse the delay performance of a point-to-multipoint cognitive radio network which is sharing the spectrum with a point-to-multipoint primary network. The channel is assumed to be independent but not identically distributed and has Nakagami-m fading. A constraint on the peak transmit power of the secondary user transmitter (SU-Tx) is also considered in addition to the peak interference power constraint. Based on the constraints, a power allocation scheme which requires knowledge of the instantaneous channel state information (CSI) of the interference links is derived. The SU-Tx is assumed to be equipped with a buffer and is modelled using the M/G/1 queueing model. Closed form expressions for the probability distribution function (PDF) and cumulative distribution function (CDF) of the packet transmission time is derived. Using the PDF, the expressions for the moments of transmission time are obtained. In addition, using the moments, the expressions for the performance measures such as the total average waiting time of packets and the average number of packets waiting in the buffer of the SU-Tx are also obtained. Numerical simulations corroborate the theoretical results.

Original languageEnglish
Title of host publication2012 IEEE International Symposium on Dynamic Spectrum Access Networks, DYSPAN 2012
Pages235-241
Number of pages7
DOIs
Publication statusPublished - 2012
Externally publishedYes
Event2012 IEEE International Symposium on Dynamic Spectrum Access Networks, DYSPAN 2012 - Bellevue, WA, United States
Duration: 16 Oct 2012 → 19 Oct 2012

Publication series

Name2012 IEEE International Symposium on Dynamic Spectrum Access Networks, DYSPAN 2012

Conference

Conference2012 IEEE International Symposium on Dynamic Spectrum Access Networks, DYSPAN 2012
Country/TerritoryUnited States
CityBellevue, WA
Period16/10/12 → 19/10/12

Fingerprint

Dive into the research topics of 'Delay analysis of a point-to-multipoint spectrum sharing network with CSI based power allocation'. Together they form a unique fingerprint.

Cite this