Skip to main navigation Skip to search Skip to main content

A hybridization of evolution strategies with iterated greedy algorithm for no-wait flow shop scheduling problems

  • Bilal Khurshid
  • , Shahid Maqsood
  • , Yahya Khurshid
  • , Khawar Naeem*
  • , Qazi Salman Khalid
  • *Corresponding author for this work
  • University of Engineering and Technology, Peshawar

Research output: Contribution to journal › Article › peer-review

Abstract

This study investigates the no-wait flow shop scheduling problem and proposes a hybrid (HES-IG) algorithm that utilizes makespan as the objective function. To address the complexity of this NP-hard problem, the HES-IG algorithm combines evolution strategies (ES) and iterated greedy (IG) algorithm, as hybridizing algorithms helps different algorithms mitigate their weaknesses and leverage their respective strengths. The ES algorithm begins with a random initial solution and uses an insertion mutation to optimize the solution. Reproduction is carried out using (1 + 5)-ES, generating five offspring from one parent randomly. The selection process employs (mu + lambda)-ES, allowing excellent parent solutions to survive multiple generations until a better offspring surpasses them. The IG algorithm's straightforward search mechanism aids in further improving the solution and avoiding local minima. The destruction operator randomly removes d-jobs, which are then inserted one by one using a construction operator. The local search operator employs a single insertion approach, while the acceptance-rejection criteria are based on a constant temperature. Parameters of both ES and IG algorithms are calibrated using the Multifactor analysis of variance technique. The performance of the HES-IG algorithm is calibrated with other algorithms using the Wilcoxon signed test. The HES-IG algorithm is tested on 21 Nos. Reeves and 30 Nos. Taillard benchmark problems. The HES-IG algorithm has found 15 lower bound values for Reeves benchmark problems. Similarly, the HES-IG algorithm has found 30 lower bound values for the Taillard benchmark problems. Computational results indicate that the HES-IG algorithm outperforms other available techniques in the literature for all problem sizes.
Original languageEnglish
Article number2376
Number of pages22
JournalScientific Reports
Volume14
Issue number1
DOIs
Publication statusPublished - 29 Jan 2024

Keywords

  • Adaptation
  • Bee colony algorithm
  • Blocking
  • Flowshops
  • Mechanism
  • Minimization
  • Minimizing makespan
  • Optimization algorithm
  • Search
  • Total tardiness

Fingerprint

Dive into the research topics of 'A hybridization of evolution strategies with iterated greedy algorithm for no-wait flow shop scheduling problems'. Together they form a unique fingerprint.

Cite this